BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART;VALUE=DATE:20140814
DTEND;VALUE=DATE:20140815
TRANSP:TRANSPARENT
X-MICROSOFT-CDO-ALLDAYEVENT:TRUE
SUMMARY:Lean 101 Manufacturing - Lego Planes
DESCRIPTION:This full day workshop teaches a system-wide approach to maximizing material flow and the elimination of waste.  Learn to avoid defects\, overproduction\, waiting\, non-value processing\, transportation\, inventory\, motion\, and under-utilized employees. The simulation we will be building planes via Legos.
X-ALT-DESC;FMTTYPE=text/html:This full day workshop teaches a system-wide approach to maximizing material flow and the elimination of waste.&nbsp\; Learn to avoid defects\, overproduction\, waiting\, non-value processing\, transportation\, inventory\, motion\, and under-utilized employees. The simulation we will be building planes via Legos.
LOCATION:San Juan College Quality Center for Business
UID:e.744.1182
SEQUENCE:3
DTSTAMP:20260429T201953Z
URL:http://gallup-mckinley-gzcms.preview.gochambermaster.com/events/details/lean-101-manufacturing-lego-planes-08-14-2014-1182
END:VEVENT

END:VCALENDAR
